Two 100 Ah packs, same model, same day of installation, same load. Three years later one tests at 78 percent of rated capacity and the other at 94 percent. The cells were not the problem. The wiring was. In a parallel bank, current divides by loop resistance, not by the number printed on the label, and a few tenths of a milliohm are enough to make one pack do 40 percent of the work.
Measured distribution on a four-pack 12 V bank carrying 200 A total, with 0.5 m of 35 mm² cable per pack. Only the wiring changed between rows.
| Wiring method | Pack 1 | Pack 2 | Pack 3 | Pack 4 | Spread |
|---|---|---|---|---|---|
| Common busbar, equal cable lengths | 51 A | 50 A | 50 A | 49 A | 4 percent |
| Diagonal: positive at pack 1, negative at pack 4 | 54 A | 49 A | 48 A | 49 A | 12 percent |
| Daisy chain, load at pack 1 | 84 A | 56 A | 38 A | 22 A | 280 percent |
| Daisy chain with one 1.5 m cable | 92 A | 58 A | 34 A | 16 A | 475 percent |
Every amp a starved pack does not carry is carried by a loaded one. In the daisy-chain case the first pack cycles 1.7 times as hard as the average, which is how a bank ends up with one pack at 78 percent while the others look healthy. Diagonal wiring beats a chain, but a busbar with equal cable lengths is the only layout that holds inside 5 percent as the bank grows.
Every cable, lug, fuse and joint adds series resistance. In a daisy chain the far pack sees every segment between it and the load, so the near pack takes more than its share. Loop resistance of 0.5 m of 35 mm² copper is about 0.5 mΩ, while a poorly torqued M8 lug can add 0.2 mΩ by itself. That is the same order as the cable, which is why hardware discipline matters as much as gauge.
Size cable for the bank discharge you will actually see, not the sum of datasheet maximums. Then size the fuse above continuous current and below cable ampacity. Values assume copper cable, 3 m or less one way, and a 3 percent drop budget.
| System | Bank discharge | Cable | Approx. ampacity | Class T fuse |
|---|---|---|---|---|
| 12 V | 150 A | 50 mm² / 1/0 AWG | 200 A | 200 A |
| 12 V | 250 A | 70 mm² / 2/0 AWG | 250 A | 300 A |
| 24 V | 150 A | 35 mm² / 2 AWG | 160 A | 200 A |
| 48 V | 100 A | 25 mm² / 4 AWG | 130 A | 125 A |
| 48 V | 200 A | 50 mm² / 1/0 AWG | 200 A | 250 A |
48 V bank, 200 A, 50 mm², 3 m one way so 6 m of conductor: 0.0175 x 6 / 50 = 2.1 mΩ. Drop is 0.42 V, or 0.9 percent, and the cable dissipates 84 W. The same current at 12 V needs far heavier cable to stay inside 3 percent, which is why 48 V banks are easier to wire well.
Fuse each pack at 1.25 times its BMS continuous rating, so a 100 A pack takes 125 A, and the main fuse at 1.25 times bank continuous current. A pack fuse protects the pack-to-busbar cable if a BMS fails closed; it does not replace the BMS.
Independent BMS units per pack work well up to four packs: each protects itself, no communication is needed, and one pack can drop offline without shutting the bank down. Above four packs, or when the inverter needs a single state-of-charge value, use master-slave packs over CAN or RS485 and confirm the protocol is on your inverter compatibility list.
Before first connection, charge each pack to full, rest two hours, and check open-circuit voltage. Connect only when every pack is within 0.3 V of the group on a 12 V system, under 25 mV per cell. A 1 V mismatch between two 100 Ah packs can drive over 100 A of inrush. On the inverter side, pre-charge through a 25 Ω, 50 W resistor for about five seconds before closing the main fuse.
CHISEN Battery builds LiFePO4 packs from 12 V 100 Ah drop-ins to 48 V rack and floor-standing units, with matched busbar kits, Class T fuse holders and pre-charge hardware, so a parallel bank is specified as one system rather than assembled from parts. Packs ship with UN38.3 test summaries and IEC 62619 reports, and we support OEM labeling, custom cable sets and wholesale volumes for installers and distributors.