Backup Power or Peak Shaving: Why One System Needs Two Battery Sizes

2026-11-27 09:25 昌盛电池

“We need a battery for outages and to run off the cheap overnight rate” is one of the most common requests we get, and it is also the most common way to buy the wrong bank. Outage backup and tariff arbitrage pull on different limits: one is mostly about stored energy and surge power, the other is about how deep and how often you cycle that energy every single day. A 10 kWh bank can be oversized for backup-only duty and undersized for daily two-shift arbitrage at the same time.

Work the two jobs separately, then take the larger number. Here is the arithmetic, in the order you should do it.

1. Write the two briefs before you look at any catalogue

Backup brief (energy + power): what must stay on, and for how long. Fridge, lighting, router, a few sockets, maybe a water pump or an air conditioner. The bank is idle for weeks, then delivers for four to eight hours.

Peak-shaving brief (cycles + control): how many kWh per day you want to move out of the expensive window, how many shifts per day, and whether the inverter will actually dispatch on schedule. The bank is used daily, often twice a day, and it never sits fully charged for a month.

Everything else — depth of discharge, warranty reading, cable sizing — follows from which brief dominates.

2. Size the outage bank: load-hours first, then a 0.68 divisor

Build the list in watts and hours, not in “fridge plus lights”. A worked example for a European or North American home keeping the essentials alive through an evening outage:

  • Fridge 150 W × 24 h × 0.35 duty cycle ≈ 1,260 Wh
  • Lighting 200 W × 4 h = 800 Wh
  • Router, TV, sockets 250 W × 5 h = 1,250 Wh
  • Water pump or one split AC 800 W × 0.5 h = 400 Wh (surge separately, see below)

That is roughly 3,700 Wh of delivered energy. Nameplate battery capacity is not delivered energy, so divide by the practical chain:

usable = nominal × 0.8 (depth of discharge) × 0.9 (inverter efficiency) × 0.95 (wiring and ageing margin) ≈ nominal × 0.68

3,700 Wh ÷ 0.68 ≈ 5,400 Wh nominal, which on a 51.2 V bus (the 16-cell “48 V” platform) is about 105 Ah of bank capacity — round to the next standard module step, or split across two modules if the allowed parallel count permits. Then check power, because that is where backup banks fail in the field: I = P ÷ U. A 3 kW inverter draws about 62 A continuously at 48 V before efficiency and before motor starting surge. Continuous discharge current, peak current and how long the peak is allowed must cover the largest motor load you start, not just the inverter’s sticker.

3. Size the tariff bank: shifted energy times cycles, not hours

Arbitrage is an energy-times-repetitions problem. Take your meter data and fill in four numbers — no catalogue needed yet:

  1. E_shift = kWh you actually move out of the peak window per day. Read it off the bill: peak-window consumption minus whatever you are willing to keep running in that window.
  2. n = full shifts per day. One evening discharge is n = 1; a morning top-up from overnight cheap import makes n = 2 and doubles the wear.
  3. η_round-trip = inverter efficiency both ways and standby, typically around 0.9 × 0.95 for a well-set system.
  4. Usable per day = bank nominal × 0.68, the same divisor as above. Bank nominal ≥ E_shift × n ÷ η.

Example shape, using your own figures: 10 kWh shifted once a day with 0.86 round-trip gives 10 ÷ 0.86 ≈ 11.6 kWh usable, so a bank of roughly 17 kWh nameplate. Run the same numbers with n = 2 and you are at 34 kWh — twice the hardware for the same house, which is exactly the mistake people make when they quote a “backup” size and then cycle it daily.

The constraint that actually bites is cycle budget: required cycles = n × 365 × target years. Three years at one shift a day is about 1,100 full cycles; ten years at two shifts is about 7,300. Ask the supplier for cycle life with its four test conditions — ambient temperature, charge and discharge C-rate, depth of discharge, and the end-of-life capacity threshold. “Up to 6,000 cycles” without those four numbers is marketing, not a specification, and warranty terms (years, start date, degradation floor) have to be read against the same cycle budget.

4. Scenario table: what sets the size in each case

Use caseDominant limitBank size follows fromWhat to verify first
Outage backup onlyEnergy + surge powerEssential Wh ÷ 0.68, over 4–8 hContinuous and peak discharge current vs largest motor
Solar self-consumptionEvening load shapeEvening import minus what you can shift to daylightInverter charge window matches PV generation profile
Peak / off-peak arbitrageCycle depth × repetitionE_shift × n ÷ η, then cycle budgetCycles stated with all four test conditions
Small commercial demand-charge cuttingPower, then energy for the peak durationPeak kW you shave × minutes of coverageDispatch logic and meter CT placement
Telecom / UPS room on floatHigh ambient temperature over yearsAutonomy hours at the real DC loadFloat voltage behaviour and alarm/contact interface

If both briefs apply to one site, buy the larger of the two energy figures, then check the power and cycle requirements of the other — and expect that the arbitrage duty, not the outage, decides replacement timing.

5. Eight questions before you place the order

  1. Which kWh figure is nameplate and which is usable at my DoD, my temperature and my discharge rate?
  2. Continuous discharge current and peak current for how many seconds, measured at the bus voltage you will actually run?
  3. Cycle life with the four test conditions, and the capacity retention curve per year?
  4. Which protocols are exposed (RS485, CAN, dry contacts, SNMP), and is there a tested compatibility list for my inverter brand?
  5. Low-temperature charge cut-off and any heater option; the exact threshold is per batch datasheet.
  6. Maximum modules in parallel, and must they be the same batch and firmware?
  7. Warranty start date (shipment, delivery or commissioning), the degradation floor, and who pays return freight?
  8. Transport and paperwork for your lane — battery class, packing, and lead time — confirmed in writing before production.

6. Short answers to the questions that follow every quote

Can I keep my old lead-acid charger or inverter settings? No. Termination voltage and charge curve differ; use the lithium profile or a purpose-built charger, otherwise you overcharge.

Do I need the biggest bank for backup? Backup usually fails on power, not energy. Size for the surge of the largest load you start, then check hours.

Is a deeper discharge better for arbitrage? Shallow daily cycles with a larger bank usually outlive deep cycles on a smaller one. Compare cost per delivered kWh, not per unit.

Can I add capacity later? Only within the allowed parallel count, and normally with matching batch and firmware — confirm before you assume a staged build.

How do I compare two suppliers on price? Divide the quoted price by (usable kWh × warranted cycles). That single number exposes both capacity inflation and cycle-life inflation.

Send us your load list, your tariff windows and your inverter model, and we will size both briefs for you and say which one dominates. For a 51.2 V home and telecom bank, see the 51.2 V 48 Ah LiFePO4 battery and the 51.2 V 72 Ah model; for 24 V homes the 25.6 V 140 Ah 8D battery; for 12 V RV, marine and small off-grid swaps the 12.8 V 100 Ah Group 31 battery. Call 4000 555 939 or write to sales@chisen.cn — CHISEN Battery, Hangzhou.