“We need a battery for outages and to run off the cheap overnight rate” is one of the most common requests we get, and it is also the most common way to buy the wrong bank. Outage backup and tariff arbitrage pull on different limits: one is mostly about stored energy and surge power, the other is about how deep and how often you cycle that energy every single day. A 10 kWh bank can be oversized for backup-only duty and undersized for daily two-shift arbitrage at the same time.
Work the two jobs separately, then take the larger number. Here is the arithmetic, in the order you should do it.
Backup brief (energy + power): what must stay on, and for how long. Fridge, lighting, router, a few sockets, maybe a water pump or an air conditioner. The bank is idle for weeks, then delivers for four to eight hours.
Peak-shaving brief (cycles + control): how many kWh per day you want to move out of the expensive window, how many shifts per day, and whether the inverter will actually dispatch on schedule. The bank is used daily, often twice a day, and it never sits fully charged for a month.
Everything else — depth of discharge, warranty reading, cable sizing — follows from which brief dominates.
Build the list in watts and hours, not in “fridge plus lights”. A worked example for a European or North American home keeping the essentials alive through an evening outage:
That is roughly 3,700 Wh of delivered energy. Nameplate battery capacity is not delivered energy, so divide by the practical chain:
usable = nominal × 0.8 (depth of discharge) × 0.9 (inverter efficiency) × 0.95 (wiring and ageing margin) ≈ nominal × 0.68
3,700 Wh ÷ 0.68 ≈ 5,400 Wh nominal, which on a 51.2 V bus (the 16-cell “48 V” platform) is about 105 Ah of bank capacity — round to the next standard module step, or split across two modules if the allowed parallel count permits. Then check power, because that is where backup banks fail in the field: I = P ÷ U. A 3 kW inverter draws about 62 A continuously at 48 V before efficiency and before motor starting surge. Continuous discharge current, peak current and how long the peak is allowed must cover the largest motor load you start, not just the inverter’s sticker.
Arbitrage is an energy-times-repetitions problem. Take your meter data and fill in four numbers — no catalogue needed yet:
Example shape, using your own figures: 10 kWh shifted once a day with 0.86 round-trip gives 10 ÷ 0.86 ≈ 11.6 kWh usable, so a bank of roughly 17 kWh nameplate. Run the same numbers with n = 2 and you are at 34 kWh — twice the hardware for the same house, which is exactly the mistake people make when they quote a “backup” size and then cycle it daily.
The constraint that actually bites is cycle budget: required cycles = n × 365 × target years. Three years at one shift a day is about 1,100 full cycles; ten years at two shifts is about 7,300. Ask the supplier for cycle life with its four test conditions — ambient temperature, charge and discharge C-rate, depth of discharge, and the end-of-life capacity threshold. “Up to 6,000 cycles” without those four numbers is marketing, not a specification, and warranty terms (years, start date, degradation floor) have to be read against the same cycle budget.
| Use case | Dominant limit | Bank size follows from | What to verify first |
|---|---|---|---|
| Outage backup only | Energy + surge power | Essential Wh ÷ 0.68, over 4–8 h | Continuous and peak discharge current vs largest motor |
| Solar self-consumption | Evening load shape | Evening import minus what you can shift to daylight | Inverter charge window matches PV generation profile |
| Peak / off-peak arbitrage | Cycle depth × repetition | E_shift × n ÷ η, then cycle budget | Cycles stated with all four test conditions |
| Small commercial demand-charge cutting | Power, then energy for the peak duration | Peak kW you shave × minutes of coverage | Dispatch logic and meter CT placement |
| Telecom / UPS room on float | High ambient temperature over years | Autonomy hours at the real DC load | Float voltage behaviour and alarm/contact interface |
If both briefs apply to one site, buy the larger of the two energy figures, then check the power and cycle requirements of the other — and expect that the arbitrage duty, not the outage, decides replacement timing.
Can I keep my old lead-acid charger or inverter settings? No. Termination voltage and charge curve differ; use the lithium profile or a purpose-built charger, otherwise you overcharge.
Do I need the biggest bank for backup? Backup usually fails on power, not energy. Size for the surge of the largest load you start, then check hours.
Is a deeper discharge better for arbitrage? Shallow daily cycles with a larger bank usually outlive deep cycles on a smaller one. Compare cost per delivered kWh, not per unit.
Can I add capacity later? Only within the allowed parallel count, and normally with matching batch and firmware — confirm before you assume a staged build.
How do I compare two suppliers on price? Divide the quoted price by (usable kWh × warranted cycles). That single number exposes both capacity inflation and cycle-life inflation.
Send us your load list, your tariff windows and your inverter model, and we will size both briefs for you and say which one dominates. For a 51.2 V home and telecom bank, see the 51.2 V 48 Ah LiFePO4 battery and the 51.2 V 72 Ah model; for 24 V homes the 25.6 V 140 Ah 8D battery; for 12 V RV, marine and small off-grid swaps the 12.8 V 100 Ah Group 31 battery. Call 4000 555 939 or write to sales@chisen.cn — CHISEN Battery, Hangzhou.