Search "group 31 lithium" and you get a hundred pages promising a drop-in swap. The box really does bolt into the same tray, but three things decide whether the installation works: the charger profile, the BMS current limits, and how much energy you actually pull in a day. This article gives you the sizing arithmetic, a fitment table for the 12 V formats we build, and the checks to run before you close the lid.
A BCI group number specifies footprint, terminal positions and case height — not capacity and not chemistry. A group 31 case is the long 12 V tray that most RV, marine and off-grid builds standardise on because it carries more plates (and more cells) than a group 24 in the same bay. When you replace lead-acid with LiFePO4 in that tray, three things change even though the box shape is identical:
So treat "drop-in" as a mechanical statement. The electrical side is your homework, and it is arithmetic rather than opinion.
Work in watt-hours first. List every load, multiply by hours per day, then correct for the losses between the battery and the appliance:
Step 1 — Daily energy. DC loads: W x h. AC loads through an inverter: (W x h) / 0.85 for a typical inverter efficiency.
Step 2 — Apply usable depth. Divide the total by 0.8, the depth of discharge normally used for planning a lithium house bank.
Step 3 — Convert to amp-hours. Ah = Wh / 12.8 for a nominal 12.8 V LiFePO4 pack.
Step 4 — Add the cold and ageing margin. If the boat or van lives outdoors below freezing, derate again or specify a pack with a low-temperature charge cut-off; the exact figures must come from the datasheet for the batch you buy.
Worked example: a weekend setup running a 40 W fridge 8 h (320 Wh), a water pump 60 W for 20 min (20 Wh), phone and camera charging 30 Wh, and a 50 W inverter-fed laptop 3 h (150 / 0.85 = 176 Wh). Total 546 Wh; divided by 0.8 = 683 Wh usable to buy; divided by 12.8 V = 53 Ah. A single 100 Ah group 31 gives roughly 1.8 days of that load without charging, which is exactly the headroom you want when the weather or the drive is not cooperating.
Do the same calculation in reverse when you are checking a supplier's runtime claim: hours = (Ah x 12.8 x 0.8) / W. If the number they quote cannot be reproduced from their own amp-hour figure and a stated depth of discharge, it is marketing, not a specification.
The table below compares the formats by role and by what you must measure on your own boat, RV or cabin before ordering. Capacity column uses nameplate ratings only; check case dimensions and terminal layout against your tray on the product page or the datasheet, because a group label alone does not guarantee clearance for the cable lugs and the hold-down bar.
| Format (nameplate) | Fits the tray designed for | Check on your side | Best role | Product page |
|---|---|---|---|---|
| 12.8 V 100 Ah, group 31 | Long 12 V group 31 bay | Tray length, lug clearance, hold-down height | RV and marine house bank, off-grid 12 V loads | Our 100 Ah group 31 page |
| 12.8 V 100 Ah, group 27 | Shorter group 27 bay | Case width and terminal polarity | Tight battery boxes, trailer and 4x4 aux systems | Our 100 Ah group 27 page |
| 12.8 V 100 Ah, DST footprint | Dual-purpose / shallow tray | Post height vs. cover clearance | Where the lid or fuse box limits height | Our 100 Ah DST-format page |
| 200 Ah class (8D format) | Large 8D rack tray | Floor loading and rack width | Bigger off-grid banks, inverter-driven cabins | Ask us for the current 8D option |
| 7.2 Ah / 20 Ah small packs | Security and emergency cabinets | M mounting footprint, terminal spacing | Alarm panels, CCTV, gateway backup | Our 7.2 Ah and 20 Ah pages |
If you are building above 12 V, the same 100 Ah blocks can be stacked into 24 V or 48 V banks, but the maximum number of units in series or parallel is a manufacturer limit, not something to improvise — confirm it in writing before you order the cables and the breaker. Series/parallel limits for our packs are given on the product page and in the datasheet.
The charger or alternator regulator. A legacy three-stage lead charger will spend minutes at an absorption voltage tuned for lead, and it will try to hold a float that a lithium pack does not want. Either select a charger with a LiFePO4 profile, or put a DC-DC charger between the alternator and the house bank. When you charge from the alternator directly, a smart alternator or a regulator set for lithium is not optional — it protects the alternator as much as the cells.
Solar controller. Most MPPT units have an LFP mode; set the absorption and float targets from the datasheet instead of borrowing lead-acid defaults, and record what you set.
Continuous and surge current versus your loads. Add up the steady draw, then check the largest single surge: a fridge compressor, an induction hob, a water heater, a bilge or live-well pump, a windlass or bow thruster. Those inrush figures must sit inside the protection limits of the pack's BMS, and the manufacturer's continuous and peak ratings (with the duration of the peak) belong in your purchase document. Our product pages list these values; if a number you need is missing, ask for it rather than assuming.
Low-temperature charging. Charging LiFePO4 below freezing is what damages these cells, not discharging them. If your build sleeps outdoors in winter, you need either a heated pack or a charge cut-off, and you should verify the exact cut-off threshold on the datasheet for the batch you receive.
State-of-charge measurement. Budget for a shunt-based monitor. Voltage is a poor indicator on a flat discharge curve, and a gauge that reads 100% while the bank is at 40% is the most common complaint we hear after a retrofit.
Cabling and protection. Keep the same Class T or equivalent breaker you would use with lead, sized to the inverter, and torque terminals to spec. Lithium can deliver current that a marginal connection will not survive.
Can I keep my existing lead-acid charger? Only if it can be set to a lithium profile and does not apply a long high-voltage stage or a lead float. Measure at the terminals; do not trust the sticker.
Is a group 31 the same as a group 27? Same nominal 12 V class, different case length and plate count. Choose the one that fits your tray and the capacity your watt-hour table requires; the two are not interchangeable in a fixed bay.
Why does my new battery "lose charge" sitting on the shelf? Self-discharge on these packs is low. A dropping reading usually comes from parasitic loads, a shunt that has drifted, or a charger that stopped charging at a set point.
Can two 12 V batteries replace my 24 V system? Only with a compatible charger and inverter. Rewiring a system from 24 V to 12 V raises current for the same power and forces you to re-size cable and protection, so do the arithmetic first.
How many group 31 packs can I parallel? There is a manufacturer maximum for units in parallel and in series, and it depends on the BMS design. Use the figure on the product page or request it in writing instead of adding "one more" on site.
Is lithium really cheaper over ten years? It usually is on a cost-per-usable-kWh basis, because usable depth of discharge and cycle count both improve over lead. Build the comparison from your own cycle count and the usable capacity each chemistry delivers rather than from the nameplate rating.
Talk to us with your watt-hour table and a photo of the battery box, and we will map it to the right 12 V format and confirm the charge window, current limits and series rules in writing: 4000 555 939 / sales@chisen.cn. Related product pages: SPF12V100-ST-G31 (12.8 V 100 Ah, group 31), SPF 12.8 V 100 Ah group 27, SPF 100 Ah DST footprint, 12 V 20 Ah compact pack.