Requests for telecom backup batteries usually start with two numbers: 48V and how many ampere-hours. That is the wrong order. Ah means very little until the load, the required autonomy hours, the temperature of the room or cabinet and the share of rated capacity the chemistry actually delivers are all known. The following is the four-step calculation used by our export engineers, plus the derating table and the rack-side checks that decide whether the battery still does its job when the rectifier fails.
Autonomy is measured against DC load, not against the rating plate of the rectifier. Build the list item by item: radio units (count the carriers actually powered, not the ones the mast could later host), transmission gear, access and aggregation switches, the DC distribution and monitoring panel, plus any small AC load carried through an inverter. Record average watts for each item; reserve peak watts only for the current check later on.
Keep the three numbers apart, because mixing them up is the most common sizing error:
We will carry one example through the rest of this article: a rooftop macro site with 300 W average DC load, 1,000 W peak, four hours of contracted autonomy, mounted in a shaded outdoor cabinet.
Step 1 - Energy at the load. E(Wh) = average load(W) x required hours. For the example: 300 x 4 = 1,200 Wh.
Step 2 - Allow for usable depth of discharge. Divide E by the DoD you design to. Lead-acid plant design is usually held at about 0.5; lithium iron phosphate can be planned around 0.8, with the real cut-off set by the BMS. 1,200 / 0.8 = 1,500 Wh.
Step 3 - Allow for temperature and ageing. Divide by a temperature factor and by an end-of-life factor. For a cabinet that runs cold in winter we take 0.9, and 0.8 so the site still meets its hours in the final year of the contract: 1,500 / 0.9 / 0.8 = 2,083 Wh.
Step 4 - Convert to Ah and to modules. Ah = Wh / nominal system voltage. 2,083 / 48 is about 43 Ah on a 48V nominal system. A 48V 50Ah pack is already tight, so most engineers would specify the next size up rather than design at the cut-off.
Do not delete Step 3 in a tender. A bank sized to exactly meet its hours on day one will miss those hours in year three. The same rule works in reverse: if the customer will not state its average load, refuse to quote a capacity.
Rated capacity is quoted at a reference temperature, typically around 20-25 C, so the installed environment decides how much of that figure survives. Cold reduces the energy that can be pulled and restricts charging; heat takes years off the bank instead of hours off the capacity. Write the derating figures into the design sheet so the numbers are auditable.
| Installation environment | What it does to the design | Planning factors |
|---|---|---|
| Air-conditioned central equipment room | Most stable case; ageing is the dominant factor | k(T)=1.0, k(age)=0.8 |
| Shelter or cabinet with passive cooling, temperate climate | Winter cold bites charging sooner than discharge | k(T)=0.85-0.9, k(age)=0.8 |
| Pole or rooftop cabinet in a hot climate | Summer heat drives ageing; life shortens before capacity does | k(T)=0.9, k(age)=0.7-0.75, size one step up |
| Cold-region site with long winter | Low-temperature charge limiting caps the refill rate after a long outage | k(T)=0.7-0.8, confirm the charge cut-off temperature of the exact model |
Lithium iron phosphate adds one constraint the lead-acid habit does not cover: charging below a set temperature must be throttled or stopped, and that limit lives in the BMS. The minimum charge temperature and the cold-weather capacity retention are model figures and have to be read from the spec sheet, not from the catalogue headline.
Voltage window. A -48V plant float setting was designed around lead-acid. Lithium iron phosphate charges to a different window, so the module charge cut-off voltage has to be confirmed against the rectifier float and boost settings before anything is connected. A mismatch usually shows up as a pack parked permanently near 90-95 per cent state of charge, or as cells being pushed past their limit.
Discharge current. Divide the peak load by nominal voltage: 1,000 W / 48V is roughly 21 A continuous in our example, with a surge above it. Compare that figure with the module's maximum continuous and peak discharge current and with the BMS over-current trip point, then size cable and fuse so that the fuse is deliberately the weakest link, not the BMS. If the BMS trips whenever a carrier reboots, the site will be down even though the battery is full.
Mechanical. Confirm module width, terminal height and cable bend radius against the existing shelf, and confirm that front-facing terminals stay reachable with the cabinet door closed. On retrofits, check the shelf and floor load rating before ordering rather than after delivery, because adding modules high in a rack changes the load path.
Monitoring. State which interface the site system needs - dry contact alarms, RS485 or SNMP - and ask which registers or alarm points are exposed. Do not assume an interface exists simply because the enclosure has a port.
Send us the average load in watts, the autonomy hours required, the installation environment and the rack depth, and we will return the module selection with the discharge current margin and a float-voltage check against your rectifier. Reach the export team on 4000 555 939 or sales@chisen.cn. Product pages for reference: 48V 30Ah LT UPS battery, 48V 150Ah LT, 48V 200Ah LT, LiFePO4 telecom battery overview, and 12.8V 100Ah Group 31 for small shelters and offices. Where a page does not yet carry complete dimensions, weight or current data those figures are to be confirmed with the business team rather than assumed.
Can the existing lead-acid string frame be kept and only the modules swapped? Only if the charge window matches the rectifier float, the footprint and terminal positions fit the shelf, and the alarm wiring is re-terminated. Float mismatch is the usual cause of a failed retrofit.
Why do two sites with the same radio load need different capacities? Because autonomy hours and the environment differ, and because a hot cabinet ages the bank faster than an air-conditioned room even when the load list is identical.
Is it acceptable to parallel modules? Only modules of the same model and batch, and within the parallel count stated in the spec sheet. Mixing models or batches on one DC bus is a reliability risk rather than a way to save money.
What happens in winter? Available capacity falls and the BMS restricts or stops charging below a set temperature, which slows recovery after a long outage. Confirm that limit per model before committing hours.
Which documents should a supplier quote alongside the Ah figure? Charge and discharge cut-off voltages, maximum continuous and peak current, dimensions and weight, IP rating and working temperature range, rated cycle life with the test DoD and temperature, warranty with the capacity-retention commitment, alarm interface, and dangerous-goods shipping papers.